Reading University Chiller Replacement

Preparing the base for a Keyter Chiller
Fully installed Keyter Chiller
Interior of Keyter Chiller
R22 to R410a Chiller Keyter WE 5117 102 KW Cooling Capacity
Keyter chiller replacement by Aces Group
  • Removal of refrigerant charges for safe disposal.
  • Removal of redundant equipment.
  • System drain down to localised drainage points.
  • Removal of redundant pipework & Lift and Shift.
  • Adjustments to pipework to facilitate new packaged Air-cooled chiller. (standalone)
  • Preparations/construction of one small concrete base at the pre-agreed location.
  • Integral hydraulic pump kit – run around pumps + strainer kit
  • Anti-vibration mounts.
  • Integral water flow switch.
  • Commissioning and Installation.