AHU Fan Motor Replacement

AHU Fan Motor Replacement

Job Description:  AHU Fan Motor Replacement

Area: North Wharf Road, London

Issue Identified:  Following a survey our engineer discovered the AHU (air handling unit) required a new ABB motor and pulley.

Works carried out:

  • Isolated the air handling unit mechanically and electrically.
  • Removed panels to enable access to the motor.
  • Removed and replaced ABB motor.
  • Removed and replaced the pulley system.
  • Fitted belt and aligned pulley to the motor.
  • Tightened belt using adjustment bolt.
  • Test ran system.
  • Completed paperwork.


ACES Group Can Also Supply and Install New Air Handling Units – Call Us On 01865 890996

AHU – Air Handling Unit

ACES repair and maintain air handling units. We have a team of expert engineers who are experienced in the maintenance and repairs of most AHU makes and models. Call 01865 890996 to speak to our service team or you can chat live to us online.

We also provide an installation service of Air Handling Units and can carry out a survey and provide a quotation FOC.

Air Handling Units clean and flow air as part of the heating, ventilation and A/C system. The task of the AHU is to take in outside air, clean it and supply it as fresh air to a building.

Call us today for more information.

Some of the many AHU’s we support
  • Saiver Air Handling Unit A1 Series
  • Saiver Air Handling Unit A1DC Series
  • Saiver Air Handling Unit A1H Series
  • Klima-Therm Air Handling Units
  • Dalair Air Handling Units
Abbreviations

HVAC – Heating, Ventiliation and Air Conditioning, PLT – Pressure Leak Test,  PRV – Pressure Relief Valve, PPM – Planned Preventative Maintenance, OFN – Oxygen Free Nitrogen, AHU – Air Handling Unit, GWP – Global Warming Potential, VRF – Variable Refrigerant Flow, VRV – Variable Refrigerant Volume, ACU – Air Conditioning Unit, FCU – Fan Coil Unit, AC – Air Conditioning,  HP – High Pressure, LP – Low Pressure