Carry out PLT on Climaveneta Chiller 3 and Repair Comp 2 IGV

Carry out PLT on Climaveneta Chiller 3 and Repair Comp 2 IGV

Job Description: Carry out PLT on Climaveneta Chiller 3 and Repair Comp 2 IGV

Area: Bressendon Place, London

Issue Identified:  Following a recent planned preventative maintenance visit the engineer advised a PLT was required

Works carried out:

  • Isolated the unit electrically and mechanically.
  • Recovered 212.5kg R134a from Climaveneta Chiller 3 into certified cylinder for storage on site.
  • Replaced faulty IGV compressor 2.
  • Repaired leak on liquid line connection.
  • Pressure tested to 10bar with OFN (oxygen free nitrogen) to locate any further leaks.
  • Once proved released OFN to atmosphere and evacuated system to 1350 microns and conducted 30 min rise test.
  • Re-charged with recovered refrigerant, and trim charged with virgin refrigerant.
  • Test ran and commissioned.
  • Completed waste transfer note and handed to on-site representative.
  • Completed F Gas records.