Schedule of Works:

Pressure testing of circuit 2 to manufacturers recommendations.  All minor leakages such as fittings/flares will be repaired. Once all leakages have been repaired, we will undertake a final pressure test and system evacuation with commissioning of virgin refrigerant also confirming any further findings on start up.

Works Carried Out:

  • Carried out a full pressure test on circuit 2.
  • Recovered 35 kg of the 46kg charge which indicated that there was a large leak.
  • There were a few leaks found on the Schrader and the t piece that the high-pressure transducer connects.
  • Replaced the t piece and put the chiller on pressure test again.
  • We found that the front end of the compressor was leaking, therefore we replaced the gasket with our lift and shift team.
  • We put the system back on pressure test over night to be sure that our repairs had been successful.
  • When we returned in the morning the pressures had not dropped so we put it on vacuum overnight.
  • When we returned the unit had pulled down to 2.5 torr.
  • We carried out a rise test for 45 minutes to make sure there were no more leaks, it stayed at 2.5 torr.
  • We charged the unit while this was happening, we changed over the solenoid coil to a new one due to the other one being burnt out.
  • We replaced the fuses however, one of the auxiliary’s was blocked therefore we had to replace it.
  • We achieved design pressures and parameters as per manufacturers recommendations upon commissioning
  • We cleared site and left.