Area: Eldon Street, London

Issue Identified:  Chiller 1 – Circuit 1, sight glass in the compressor was flashing and required investigation.

Chiller 2 – Circuit 2, required new expansion valve

Additional benefits were: Works on both chillers were carried out one after the other to minimise disruption to the building.

Climaveneta Chiller

Works carried out:

Chiller 1

  • Isolated the Climaveneta Chiller Unit electrically and mechanically.
  • Recovered refrigerant from the Climaveneta Chiller Unit.
  • Weighed and confirmed the charge.
  • Pressure tested with OFN (oxygen free nitrogen) to locate leak.
  • Repaired leaks by means of brazing.
  • Re-pressure tested with OFN (oxygen free nitrogen) to prove system is leak tight and sight glass was no longer flashing.
  • Once proved released OFN to atmosphere and evacuated system to a minimum of 2 Torr
  • Re-charged with recovered refrigerant and trim charged with virgin refrigerant.
  • Test ran and commissioned.

Chiller 2

  • Isolated the Climaveneta Chiller Unit electrically and mechanically.
  • Recovered refrigerant from the Climaveneta Chiller Unit.
  • Weighed and confirmed the charge.
  • Removed and replaced expansion valve and filter drier cores.
  • Pressure tested with OFN (oxygen free nitrogen) to prove system was leak tight.
  • Once proved released OFN (oxygen free nitrogen) to atmosphere and evacuated system to a minimum of 2 Torr
  • Re-charged with recovered refrigerant and trim charged with virgin refrigerant.
  • Test ran and re-commissioned.
  • Completed waste transfer notes and handed to on-site representative.
  • Completed F Gas Records