Discharge Service Valve Replacement on a Bluebox Chiller
Job Description: Discharge Service Valve Replacement on a Bluebox Chiller
Area: Regent Street, London
Issue Identified: Following a planned preventative maintenance visit, our engineer advised the discharge service valve was leaking and required replacing.
Works carried out:
- Isolated the Bluebox Chiller unit electrically and mechanically.
- Recovered refrigerant into certified cylinder for storage on site.
- Weighed and confirmed the charge.
- Remove the discharge service valve and replace it with new.
- Pressure tested with OFN (oxygen free nitrogen) to locate any leaks.
- Once proved released OFN (oxygen free nitrogen) to atmosphere and evacuated system to a minimum of 2 Torr.
- Re-charged with recovered refrigerant and trim charged with virgin refrigerant.
- Test ran and commissioned.
- Completed waste transfer note and handed to on-site representative.
- Completed F Gas records.

ACES Group Can Also Supply and Install New Chillers – Call Us On 01865 890996

Some of the many Bluebox units we support
- Kappa Sky
- Kappa Sky LGW
- Kappa Rev
- Kappa Rev LGW
- Kappa V Evo
- Zeta Rev HE FC
- Zeta Rev HEi FC
- Tetris 2 FC
- Kappa Sky FC
- Kappa Rev FC
- Kappa V Evo FC
- Zeta Sky
- Tetris SKY R7
Abbreviations
HVAC – Heating, Ventiliation and Air Conditioning, PLT – Pressure Leak Test, PRV – Pressure Relief Valve, PPM – Planned Preventative Maintenance, OFN – Oxygen Free Nitrogen, AHU – Air Handling Unit, GWP – Global Warming Potential, VRF – Variable Refrigerant Flow, VRV – Variable Refrigerant Volume, ACU – Air Conditioning Unit, FCU – Fan Coil Unit, AC – Air Conditioning, HP – High Pressure, LP – Low Pressure
Ref: 2261