Fan Coil Maintenance
Or you can visit our online shop to purchase click here
Fan Coil Maintenance
Aces group specialise in the maintenance of all items mechanical and electrical. Working with our specialist building services partners we offer bespoke contracted fan coil maintenance usually out of hours at pre-scheduled visits. The aim is to assist the primary building services contractor which reduces the out of hours requirements for the primary contractor often saving money to allow the primary contractor to focus on key maintenance activities rather than having their skilled and expensive full-time staff working around the clock to keep up with fan coil maintenance. Our bespoke maintenance plans are designed to match your key contracted schedules and requirements often exceeding sfg20.
Our engineers are all experts in their field with a wealth of knowledge and experience. We are on call 24/7 all year round. We pride ourselves on our customer services so call us today on
Key benefits include
- We fill in and complete your own paperwork if required often working under your branding. All our engineers are pad and laptop trained
- We have the capabilities to complete in excess of 2000 Fancoils in one weekend
- Financial savings
- Reduced staff and labour requirements
- Remedial quotations within hours of financial maintenance
- Reduced management time including spares management
- Fan motor bearings (Quarterly)
- Filter maintenance (Quarterly)
- Pipe assemblies (Bi-Annually)
- Fan coil casings (Bi-Annually)
- Valves and solenoid assemblies (Quarterly)
- Three-Two & Four port valves (Quarterly)
- Air On & Off the FCU (Quarterly)
- Electrical motors (Quarterly)
- Electrical terminals and connections (Quarterly)
- Fan motor running amps (Quarterly)
- Solenoid coils (Quarterly)
- Electrical heating elements (Quarterly)
- Condensate pump motors (Quarterly)
- BMS integration and control (Quarterly)
- Calibration of control stats (Quarterly)
- Time clocks (Quarterly)
- Water temperatures (Quarterly)
- Water quality (Quarterly)
- Water strainers (Quarterly)
- CHW valve assemblies (Quarterly)
- LTHW valve assemblies (Quarterly)
- Flow rates (Annually)
- Insulation (Bi-annually)