ICS Cool Energy System Flush
Job Description: ICS Cool Energy System Flush
Area: Greenwich, London
Issue Identified: Following a call out on site our engineer advised that the actuator motor had failed on the ICS Cool Energy chilled water system and required replacing. He has also advised that the pipework required flushing and cleaning.
Works carried out:
- Isolated the water chiller unit.
- Drained the system.
- Flushed through the chilled water system to remove sediment and foreign bodies.
- Removed and cleaned strainers.
- Mixed glycol to 16c and filled the system and removed air.
- Replaced the motorized valve power head and adjusted to correct settings.
- Cleaned condensers.
- Ran and tested chillers