PRV Replacements on 3 Turbocor Chillers
Job Description: PRV Replacements on 3 Turbocor Chillers
Area: Overton Mill, Basingstoke
Issue Identified: Following a recent visit to site it was found Pressure Relief Valves were out of date on 3 Turbocor Chillers.
Scope of Works Carried Out:
- Closed the discharge and liquid service valves and decanted the charge over to the evaporator side of the system.
- Replaced the PRV (pressure relief valves) fitted to the chiller.
- Commissioned the chiller back to service.
- Completed each chiller on consecutive days to keep works across the chillers to a minimum i.e. not working on several in a day and risking the load.
- PRV (pressure relief valves) fitted were high side PRV 2 x 20 bar 1/2″ x 1″ g14/s, 2 x 20 bar 1″ x 1-1/4″ g20/s, low side manifold 2 x 16bar 3/4″-1″ g14/s.
- All PRV (pressure relief valves) included certificates of conformity.


Some of the many Turbocor Chillers we support
- 0301A
- 0401A
- 0532A
- 0632A
- 0752A
- 0903A
- 1103A
ACES Also Supply And Install New Chillers – Call Us For More Information 01865 890996
Abbreviations
HVAC – Heating, Ventiliation and Air Conditioning, PLT – Pressure Leak Test, PRV – Pressure Relief Valve, PPM – Planned Preventative Maintenance, OFN – Oxygen Free Nitrogen, AHU – Air Handling Unit, GWP – Global Warming Potential, VRF – Variable Refrigerant Flow, VRV – Variable Refrigerant Volume, ACU – Air Conditioning Unit, FCU – Fan Coil Unit, AC – Air Conditioning, HP – High Pressure, LP – Low Pressure