Remove and Overhaul 3 Compressors on a Trane Chiller
Job Description: Remove and Overhaul 3 Compressors on a Trane Chiller
Area: Fish Dam Lane, Barnsley
Issue Identified: Client requested a quote for the overhaul of 3 compressors

Scope of Works Carried Out:
- Recovered both refrigerant circuits of Trane Chiller into receiver cylinders.
- Weighed charges for F Gas and reported on any shortages.
- ACES Lift and Shift Team removed the 3 compressors from site and returned to our Factory in Oxfordshire for strip down, inspection and overhaul.
- Overhauled each compressor within 2 weeks (total) and returned them to site.
- ACES Lift and Shift Team refitted the 3 compressors.
- Carried out a detailed pressure leak test on both circuits.
- Fitted compressor switch gear in the main panel.
- Once holding, we evacuated each circuit to below 2 Torr.
- Recharged with the recovered refrigerant.
- Completed F Gas paperwork