Job Description:  Replace Dual Port Valve on a Trane Chiller

Area: One New Change London

Issue Identified:  Following a recent planned preventative maintenance visit our engineer found a leaking dual-port, therefore a pressure test was required and a new dual-port to be fitted.

Works carried out:

  • Isolated the Trane Chiller unit electrically and mechanically.
  • Recovered remaining refrigerant.
  • Weighed and confirmed the charge.
  • Replaced the Dual-Port Valve.
  • Re-charged with nitrogen and confirmed leak tight.
  • Once proved release OFN to the atmosphere and evacuated the system to a minimum of 2 Torr.
  • Re-charged with recovered refrigerant and trim charged with virgin refrigerant.
  • Test ran and commissioned.
  • Completed waste transfer note and handed to an on-site representative.
  • Completed F Gas certificate.

ACES Group Can Also Supply and Install New Chillers – Call Us On 01865 890996

ACES service and maintain Trane Chillers. Trane Chillers are used for a variety of applications including process cooling where tough demands are placed on all types of temperature conditions, strict control and constancy.

Some of the many Trane Chillers we support
  • Flex II chiller
  • Conquest chiller CGAX
  • TraneCube CGB chiller
  • AquaStream 3G chiller CGAM
  • City RTSF G chiller
  • CGWN/CCUN Chiller
  • RTHD evo chiller Series R
  • RTWD/RTUD chiller
  • XStream RTWF chiller
  • XStream RTHF chiller
  • eCTV CenTraVac centrifugal chiller CVHH/CDHH
Abbreviations

HVAC – Heating, Ventiliation and Air Conditioning, PLT – Pressure Leak Test,  PRV – Pressure Relief Valve, PPM – Planned Preventative Maintenance, OFN – Oxygen Free Nitrogen, AHU – Air Handling Unit, GWP – Global Warming Potential, VRF – Variable Refrigerant Flow, VRV – Variable Refrigerant Volume, ACU – Air Conditioning Unit, FCU – Fan Coil Unit, AC – Air Conditioning,  HP – High Pressure, LP – Low Pressure