Robur Gas Fired Absorption Chiller Combustion Chamber Total Overhaul

Robur Gas Fired Absorption Chiller Combustion Chamber Total Overhaul

Job Description:  Robur Gas Fired Absorption Chiller Combustion Chamber Total Overhaul.

Area: Oxford

Works carried out:

  1. Isolated gas supply and chiller (already made safe at service visit)
  2. Removed combustion chamber and dismantle.
  3. Replaced parts as listed.
  4. Reinstalled combustion chamber and opened gas valve/confirmed that all newly installed parts were leak tight.
  5. Reinstated power to unit and allowed time to reboot/seen by the BMS system and sequencer.
  6. Asked site to retarget Robur Chiller B via the BMS.
  7. Once running, confirmed correct operation and issued gas safety certificate accordingly.
  8. Cleared site of old parts and waste.

ACES Group Can Also Supply and Install New Air-Conditioning Units – Call Us On 01865 890996

Absorption Chillers – Maintenance and Service Contracts

Absorption Chillers maintenance and service contracts (Planned Preventative Maintenance) can be tailored to your specific needs. Whether you require bi-annual visits, quarterly visits or a ‘One Off’ maintenance solution, which can be essential if the equipment is changing hands or becoming the responsibility of a new tenant. ACES will provide the necessary documentation ensuring peace of mind for the transfer.

From simple F-gas compliance to complex process cooling and critical plant maintenance. All Planned Preventative Maintenance quotations are supplied free of charge. Phone – 01865 890996

Abbreviations

HVAC – Heating, Ventiliation and Air Conditioning, PLT – Pressure Leak Test,  PRV – Pressure Relief Valve, PPM – Planned Preventative Maintenance, OFN – Oxygen Free Nitrogen, AHU – Air Handling Unit, GWP – Global Warming Potential, VRF – Variable Refrigerant Flow, VRV – Variable Refrigerant Volume, ACU – Air Conditioning Unit, FCU – Fan Coil Unit, AC – Air Conditioning,  HP – High Pressure, LP – Low Pressure