Robur Gas Fired Absorption Chiller Combustion Chamber Total Overhaul
Job Description: Robur Gas Fired Absorption Chiller Combustion Chamber Total Overhaul.
Area: Oxford
Works carried out:
- Isolated gas supply and chiller (already made safe at service visit)
- Removed combustion chamber and dismantle.
- Replaced parts as listed.
- Reinstalled combustion chamber and opened gas valve/confirmed that all newly installed parts were leak tight.
- Reinstated power to unit and allowed time to reboot/seen by the BMS system and sequencer.
- Asked site to retarget Robur Chiller B via the BMS.
- Once running, confirmed correct operation and issued gas safety certificate accordingly.
- Cleared site of old parts and waste.

ACES Group Can Also Supply and Install New Air-Conditioning Units – Call Us On 01865 890996
Absorption Chillers – Maintenance and Service Contracts
Absorption Chillers maintenance and service contracts (Planned Preventative Maintenance) can be tailored to your specific needs. Whether you require bi-annual visits, quarterly visits or a ‘One Off’ maintenance solution, which can be essential if the equipment is changing hands or becoming the responsibility of a new tenant. ACES will provide the necessary documentation ensuring peace of mind for the transfer.
From simple F-gas compliance to complex process cooling and critical plant maintenance. All Planned Preventative Maintenance quotations are supplied free of charge. Phone – 01865 890996

Abbreviations
HVAC – Heating, Ventiliation and Air Conditioning, PLT – Pressure Leak Test, PRV – Pressure Relief Valve, PPM – Planned Preventative Maintenance, OFN – Oxygen Free Nitrogen, AHU – Air Handling Unit, GWP – Global Warming Potential, VRF – Variable Refrigerant Flow, VRV – Variable Refrigerant Volume, ACU – Air Conditioning Unit, FCU – Fan Coil Unit, AC – Air Conditioning, HP – High Pressure, LP – Low Pressure